Nieuws

  • Fight With “Coronavirus” , Stay Strong With Xinyue
    Post time: Feb-19-2020

    In 2020, the Spring Festival, all working people in China have experienced the longest vacation since graduation. 66 days have passed since the first case of infection was reported in Wuhan on December 8, 2019. About one week ago, when I returned to Tianjin and arrived in the residential quarters...Lees meer »

  • “Xinyue Steel” Brand Iron Pipe Delivered Successfully
    Post time: Feb-19-2020

    At beginning of Nov 2019, one of Xinyue Steel Group’s regular client sent a new PO again, ductile iron pipe, which is for local authority’s water pipeline project that’s under construction. Besides normal technical requests: ductile iron pipes should confirm to ISO2531-k9, T type joint in lengths...Lees meer »

  • Xinyue Supported Piling Project in New Zealand
    Post time: Feb-19-2020

    During the National Day Holiday in 2019, Xinyue received an inquiry for a piling project in New Zealand. Through detailed communication and negotiation with customers, the customers knew that Xinyue Group has rich experience in supplying such kind of projects, and also has great experience in New...Lees meer »

  • West African Oil Casing Pipe Project Completed Successfully
    Post time: Feb-19-2020

    In early October 2019, Xinyue received an oil casing pipe enquiry from our West Africa customers. After confirming the technical conditions in the afternoon, we checked and implemented the final material requirements, buckle types and length requirements with our customers. On the second day, the...Lees meer »

  • The Pipe Fitting for Indonesian Project was Successfully Shipped
    Post time: Feb-10-2020

    At the end of November, Xinyue welcomed the inspection of boiler pipes, pipe fittings and valves for sugar factory project by Indonesian end user customers. During the inspection, the second batch and the third batch of pipe fittings and valves orders were successively signed. The total order inc...Lees meer »

  • Weathering Steel Long Piles Successfully Shipped from Xinyue
    Post time: Feb-10-2020

    In early October 2019, Xinyue received a special long pile inquiry from a South American customer for the purpose of cable car piling. The special point is the material. This inquiry requires that the material steel grade is ASTM A588 Gr.A, which is a weathering steel. Compared with the ordinary ...Lees meer »

  • Xinyue Steel Won a Structural Project for New Zealand Hotel
    Post time: Feb-10-2020

    At the beginning of Dec, 2019, Xinyue Steel has been awarded a structural project of New Zealand Hotel, specific products were LSAW EN10219 S355J0H DN600-DN800 with heavy wall thickness 30-60mm. The customer is from a project company which has high reputation in local steel industry, have known X...Lees meer »

  • Tianjin Xinyue Steel Group’s Annual Party
    Post time: Jan-15-2020

    In 2019, Xinyue is soaring in the sky In 2020, Xinyue will cooperate all over the world In 2019, the dream of Xinyue people is growing In 2020, Xinyue people will voyage together with the dream 2019 has passed, we have ushered in 2020, a new start, a new journey. In order to celebrate the achieve...Lees meer »

  • Huayou Steel Pipe’s Annual Party Grand Held By Today
    Post time: Jan-15-2020

    With the ending 2019, we usher in a new 2020 year. After the New Year’s holiday day (early January), Tianjin Huayou Steel Pipe held the annual party today, with hundreds staff joined together to imagine a better 2020 year. Party opened by the leadership speech, Mr.Liu and Mr.Ren gave a spee...Lees meer »