West African Drinking Water Transmission GG-3

Project Name: Drinking Water Transmission
Closed Year: 2017
Pipe Spec: 711.2mm*14mm*12m
Coating Type:
Exterior coating 3PE 2.5mm NFA49.710
Interior coating: FBE 300 microns according to AWWA-C213
Introduction for the Project:
This project is a major drinking water transmission project for west African countries, is helping more and more local people to get clean water. The first batch of construction materials purchased by the project is total USD 3.5 million.