UAE EPC Undertook Somalia Ship Connection Booster Pump Pipeline Project

Project: UAE EPC undertook Diesel, Jet Fuel & LPG Products from the Ship (offshore) pumpdischarge to the booster pump pipeline project in Somalia
Project contractor:Middle East
Project location:Somalia
Product:SEAMLESS STEEL PIPE
Standard and material:API 5L /ASTM A106 GR B
Specifications:12”& 10”
Tonnage:2300tons
Usage:Gasoil, Fuel Discharge,LPG transmission pipeline 
Supply time:2022

 

This cooperation is made with Xinyue regular customer in UAE. This project aims to cater a 60,000 DWT vessel with storage capacity of about 58,000m3 of petroleum product. The Jetty Diesel, Jet Fuel & LPG Pipelines transmit from the ship (offshore) pump discharge to the booster pump piping inlet Tie-in point.The gas oil /Diesel, Jet Fuel & LPG ships will berth at draft of 21meter, then the ship discharge pipeline will be installed at 21meters down from the ship discharge /unloading pumps.In this way, CWC will be the first choice for this project, which can make the pipelines stably maintained in the sea bed, provide the necessary negative buoyancy during pipeline installation , meanwhile offer effective mechanical protection

Concrete weight coating for this project was 50mm thickness which had been strictly produced and tested according to ISO 21809-5 and DNVGL-ST-F101 with fully curing of 28days to further secure the good performance of CWC.In addition , Xinyue had challenged to delivery 90 containers together in one shipment with 5days time for inner transportation and container loading , it is a significant task, but we make it with our accumulated shipping experience and efficient coordination ability of various links. All products were shipped to Somalia in October, 2022, and customer feedback was very good. Both parties have started a new round of order cooperation.