South American Belize Port Coral Cruise Terminal Project

Project location:Belize Island Country in South America
Product:SSAW STEEL PIPE
Standard and material:
ASTM A252 GRADE,ASTM A572 GRADE 50
Specifications:
914.4*19.05mm*12m
914.4*19.05mm*20m
914.4*19.05mm*21m
914.4*19.05mm*22.5m
Application:Terminal construction
Inquiry time:2020.01.08
Order time:2020.07.15
Shipping time:2021.01.11
Arrival time:2021.02.25

 

This project was the Coral Harbor Cruise Terminal project in Belize, South America. It was ordered by a Panamanian client, IMI, which was established in 1995. It mainly engages in various design, engineering, maintenance, modernization and maintenance of maritime structures and facilities. The order product is 2631 tons of spiral steel pipe welded pile boots, and the anti-corrosion is 16 mils of Carboline 300M coal tar epoxy paint. The whole process is supervised by third party TUV and customers in the factory. From each production link of raw materials, steel pipe production, welding, and anti-corrosion, Xinyue strictly controls the quality and implements according to the standard requirements. Through the full cooperation of Xinyue with customers and third parties, the whole batch of goods was completed on schedule, making contributions to the port construction.